Case Studies

Vextrix Case Study - Residential Property - West Kirby, Wirral

Residential Property - West Kirby, Wirral

Vextrix were appointed to provide the full range of Quantity Surveying Services for this high specification extension linking two detached properties in the Wirral, Cheshire. The role has also involved the appointment of a VAT consultant to advise on potential taxation savings.

Read More
Vextrix Case Study - National Express East Anglia

NSIP Programme for National Express East Anglia

Main station building - refurbishment with complete external refurbishment of the Victorian up side station building. On the platform the addition of a waiting shelter. The forecourt and car park remodelled on the downside and improvements made to the upside premier car park and the upside station approach road was remodelled.

Read More
Vextrix Case Study - Northern Rail - Leeds Station Cycle Point

Northern Rail - Leeds Station Cycle Point

Overseeing the construction of a two storey building to provide 308 dedicated cycle points, staff, retail and repair areas outside Leeds City Station. Based on the Dutch model of a hub to encourage cyclists to use public transport, it provides a centre for repairs and storage. It is the first of 10 planned for around the country. Vextrix have been instrumental in the development of the concept.

Read More
Vextrix Case Study - Harlow Town, National Express East Anglia

Harlow Town Car Park for National Express East Anglia

Vextrix acted as Quantity Surveyors and Project Managers for the development of the new 2 storey deck 260 additional space car park.. We were responsible for early scheme development and feasibility through to the tendering, procurement for the delivery of design and construction services for a £4m two storey, structural steel car park decking structure.

Read More
Vextrix Case Study - First Capital Connect - Hatfield Station

First Capital Connect - Hatfield Station

New multi story car park and extension to existing station building to provide new retail facilities. The contract is a traditional contract delivered using NEC contract. The project had to be delivered while the existing station remained operations.

Read More
Vextrix Case Study - Battersea Bus Depot for Travel London

Battersea Bus Depot for Travel London (Abellio)

Vextrix acted as Quantity Surveyor for the new Battersea Bus Depot. This depot was to replace the adjacent existing bus depot to accommodate new bus maintenance and stabling facilities while maintaining the existing operations.

Read More