Project: Tilbury IBA processing plant
Client: Blue Phoenix Group
Value: £40m
Services: Commercial Manager and Client Quantity Surveyor
Vextrix has been appointed to deliver Quantity Surveying services on the installation of a new processing plant within the existing Shed 3 at Tilbury Docks. Working with the Blue Phoenix Group, the world’s largest ash processor, this project supports sustainability by reducing landfill reliance and creating construction materials from Incinerator Bottom Ash (IBA).
Upgrading Infrastructure
The project includes installing a new processing plant in Shed 3, supported by piled foundations and a reinforced concrete floor slab. External works include an RCC-paved yard and a new attenuation tank for improved drainage. A ramp and conveyor system will link the facility to the existing Blue Phoenix site for seamless transport of Incinerator Bottom Ash Aggregate (IBAA). Additional upgrades include a new welfare area, a weighbridge, and the maintenance of site operations until the new facility is in operation. The Blue Phoenix Group processes IBA to recover metals for recycling and produce IBAA, a sustainable alternative to natural materials. This method reduces reliance on landfills while providing eco-friendly materials, displaying circular economics in practice